Civil
- Infrastructure Financing Authority (AFI)
Rehabilitaion of the Regional Aguadilla Water Treatment Plant - Aguadilla, PR
Upgrade capacity from 14 MGD to 20 MGD
Raw Water Pump Station - Hatillo, P.R.
Raw Water Pump Station - Aguas Buenas, P.R. - Puerto Rico Sun Oil
Install piling and concrete foundations, concrete ring wall and two 90' dia. storage tanks- Yabucoa, PR - Caribbean Refining Corporation
Install foundation for new skid desulfurization plant
Install tower foundation for 3 vessels
Install various foundations for blowers, pumps, compressor, etc.
Storage Tank foundations
Process Water Clarifier Project - Puerto Rico Electric Power Authority
Install various foundations for demineralizer pits, make up water systems, desalinization plants, etc.
Install piling and concrete foundations for structural crane way extension - Puerto Rico Aqueduct & Sewer Authority
Rehabilitation of Vega Baja Water Filtration Plant - Vega Baja, PR
Expansion of Luquillo Water Filtration Plant - Concrete water tanks, filters, flocculators, etc.
Construction of sludge treatment facilities at Cayey Regional Treatment Plant - Cayey, PR - US Navy
Rehabilitation of Capehart Sewage Treatment Plant
Rehabilitation of all three sewage treatment facilities - Ceiba, P. R.
Upgrade grit removal system - Barceloneta Waste Treatment Corporation (BWTC)
Rehabilitation of Primary and Secondary clarifiers at Regional Plant
Provide odor control system to existing clarifiers at Barceloneta Regional Waste Treatment Plant - Amgen (Fluor Daniels) Juncos, P. R.
Complete waste water treatment facility. Civil, stainless steel tanks, piping, electrical, instrumentation
Piping
- PREPA
Dock unloading system - 20" and 14" piping
San Juan - Turnkey
Design - Installation - Esso Standard Oil P.R.
Tanker oil product unloading facility at the Joint Facilities Dock
All structural, piping and electrical systems - PREPA
- Emergency Repair of Penstock 34" dia. Originally built in the 30's
Material and equipment by helicopter to site - El Yunque, P. R.
-Rehabilitation to their 20" fuel oil transfer line including internal inspection smart pig. - Caribbean Refinery (Gulf)
Installation of skid fabricated desulfurization plant
Performed factory inspection
$7 Million plant
Final pipe and structural modification
Set and pipe, 3 towers, etc. - Caribbean Refinery
Purchase, install, paint, cross country pipelines, refinery to tanker
unloading facility. 4.5 miles of supports and 10 lines. Sizes 8"dia.
to 24" dia.
Fueling Systems
- U.S. Coast Guard - Aguadilla, PR
Computerized loading facility for supplying aircraft with JP-4 fuel.
Piping instrumentation, environmental and tankage - Caribbean Petroleum Corporation
Bottom Loading Trucks
Additive systems, computerized operation and accounting
Vapor disposal
Turnkey - Design, purchase and installation - Peerless Oil & Chemicals, Inc.
Bottom Loading Trucks
Additive systems, computerized operation and accounting
Vapor disposal
Turnkey - Design, purchase and installation - The Shell Company (P.R.) Inc.
Bottom Loading Trucks
Additive systems, computerized operation and accounting
Vapor recovery system
Turnkey - Design, purchase and installation - Phillips Core - P. R.
Bottom Loading Trucks
Additive systems, computerized operation and accounting
Vapor recovery system
Turnkey - Design, purchase and installation - Esso Standard Oil Company (P.R.)
Two Terminals - Cataño and St. Thomas
Complete design purchase and installation
Civil, structural, piping, electrical, etc.
Complete design purchase and installation - Puerto Rico Electric Power Authority
Rehabilitate Fuel off loading Terminal,
5 mile 20" pipeline system, pumping station, etc. - Texaco P.R. Inc.
Two Terminals - Cataño and St. Thomas
Civil, structural, piping, electrical, etc.
Rehabilitate Fuel off loading Terminal - San Juan International Airport
-American Airlines
-Eastern Airlines
-Caribbean Airport Facilities
-P.R. Ports Authority
-Air BP
Expansion and/or replacement of aircraft fueling systems
Fueling systems - design, purchase and installation
Various contracts - 14 years
Electrical
- AFI - Carraízo Dam
Replacement of primary transformers, substation
upgrade, replacement of feeders and control system for six 15,000 GPM pumps - Caribbean Petroleum Corporation
Complete plant audit and survey to insure compliance with
Section 500 of the NEC - up to 4160 V systems
Electrical substation upgrade, monitoring and modification - 38 KV / 4160 V - Puerto Rico Electric Power Authority
South Coast Plant - Units 5 & 6
U.P.S. room for instrumentation systems, battery charging, etc.
Partial design and full installation
Civil and Electrical
New feeders for the Bunker C oil pumps - 480 V - Puerto Rico Electric Power Authority
Water Induction System - Mechanical and electrical
-Aguirre Plant
-Southcoast Plant - Puerto Rico Electric Power Authority
San Juan Steam Plant - monitoring and gauging system
for the main and storage tanks (10 total) - Caribbean Petroleum Corporation
Off-site/On-site electrical system for new desulfurization plant
Turnkey: design, supply and installation - Puerto Rico Electric Power Authority
Install new generator (diesel unit), transformer and switchgear - Culebra, PR - Caribbean Airport Facilities
Luis Muñoz Marin Airport - Carolina, PR
Complete electrical system (38 KV to 110VAC) for new 115,000 SF cargo building - US Navy
Redesign and implement new power & control systems using
PLC logic systems for all three sewage treatment plants - Ceiba, P. R. - Fibers Group
Design, permit & install new 500 KVA substation
Coatings
- Puerto Rico Electric Power Authority
Aguirre Plant - Sandblast and Paint two 230' dia x 48' high cone roof tanks
Palo Seco Plant - Sandblast and paint interior and exterior of 150' dia. x 40' high tank
San Juan Steam Plant - Sandblast, Vacuumblast and paint various tanks.
South Coast Steam Plant - Sandblast, Vacuumblast and paint various tanks. - Puerto Rico Electric Power Authority
Mayaguez Plant
Internal coating for one 95' dia. x 40 high cone roof tank - Puerto Rico Sun Oil
Sandblast and coating for three 90' dia. tanks - Yabucoa, PR - Caribbean Petroleum Corporation
Vacuum Shot blast and coat (2) 100' x 40' CR tanks
Exterior/Interior coatings to numerous tanks for over 35 years - Ogden Aviation
Concrete line and install flexible elastomeric membrane
secondary containment to Airport tank farm 60,000 SF
Interior line 3 jet fuel tanks - Miscellaneous Internal Tank Linings
The Shell Company - Over 10 Tanks
Esso Standard Oil - various tanks in both Cataño and St. Thomas
Texaco Puerto Rico Inc. - Various tanks
Peerless Oil and Chemicals - Various interior and exterior tanks
Janssen- Ortho - Interior/Exterior of fire water tank
Structural/Equipment Installations
- Infrastructure Financing Authority (AFI)
Supply and install six (6) 15,500 G.P.M. Pumps (111.50 MGD) with
1200 Horse Power synchronous brush less motors at the Carraizo Dam - Puerto Rico Electric Power Authority
Southcoast Plant
Installation of 90/25 Ton x 120' long Gantry crane;
Supply and install 120' crane structure extension - Puerto Rico Electric Power Authority
Aguirre Plant
Install 75/15 Ton x 120' Gantry crane - Puerto Rico Electric Power Authority
Various Plants
Structural modifications to gantry cranes and support structures
Mechanical rebuilding of crane components
Sandblasting and painting of structures and cranes - Caribbean Petroleum Corporation
Replacement/Installation of motors, exchanger, blowers and stacks
on a continuous basis - Caribbean Petroleum Corporation
Installation of double barge dock loading facilities
Including piping, structures, hose handling, electrical and
fire protection systems - Storage Tanks
New tanks - 1000 bbl. to 375,000 bbl.
Repairs, new bottoms, new roofs, shell replacements, new seals, etc.
Internal floating roofs - steel and aluminum - Puerto Rico Electric Power Authority
Relocation of equipment for Balanced Draft Projects
Palo Seco Plant
San Juan Plant - American Engineering Services
All phases of installation for Desalinization Plant 1.5 million GPD
PREPA - Palo Seco Plant - Puerto Rico Sun Oil
Supply and erect three 90' dia. storage tanks
Environmental
- Bristol Myers Squibb
Remediate area of ground contaminated with Kerosene - Humacao, PR - Caribbean Petroleum Corporation
Preliminary Clean-up of Equalization Pond - Chevron/AWPI/OHMEDA/Phillips Core (The Fibers Group)
Fibers Public Well Supply - Superfund Site
Phase I - Ground level remediation activities
Phase II - Subground water contamination clean-up. Included Value
Engineering and construction of an 11 well system with a filter/tower
system as well as effluent discharge - Phillips Core
Remedial Cleanup of off spec pond.
Jointly with I.T. Corporation - U.S. Navy - Roosevelt Roads, P.R.
Rehabilitate Sewage Treatment Plants (several projects) - Phillips P.R. Core, Inc.
Assisted in installation of Ground Water Interceptor Project.
Jointly performed with Retec Corporation - Puerto Rico Electric Power Authority
Removal of lead paint from cranes, structures and tanks. - Bard Cardiopulmonary, Inc.
Construction of effluent equalization system. - Las Piedras, PR - Puerto Rico Electric Power Authority
Performing Consent Decree work throughout all generating plants in Puerto Rico - Amgen (Fluor Daniel)
Build a complete pH Neutralization plant (All phases)
Mechanical
- Puerto Rico Electric Power Authority
Aguirre - Palo Seco - Southcoast- San Juan Plants
Installation of (1) 90/15 Ton, (2) 15 Ton, (1) 75/15 ton overhead gantry cranes & extend elevated railways - U.S. Coast Guard
Aguadilla
Install computerized loading facility for aircraft
Project included piping, electrical, instrumentation,environmental, and tankage - Puerto Rico Electric Power Authority
Naguabo Dam
Emergency repairs to 34" dia. pipeline
(Remote location required daily mobilization by helicopter.) - Puerto Rico Electric Power Authority
Fueling Pier - San Juan Bay
Redesign and replace 20" and 12" fuel system and truck grating - Puerto Rico Electric Power Authority
Mayaguez
Turnkey piping and tankage project
Internal coating system - Refinery Turnarounds
All phases of piping, insulation, fin fan coolers, civil, etc.
- Caribbean Refining Corporation - Esso P.R.
Tanker Oil product unloading facility
All structural, piping and electrical systems, hose handling systems, and fire protection - Caribbean Refinery
Installation of skid fabricated desulfurization plant
Performed factory inspection
Final pipe and structural modification
Set and pipe 3 towers - Sun Co. Inc.
All phases of rehabilitation to Airport Fuel Terminal. - L.M.M International Airport - Puerto Rico Aqueducts & Sewer Authority
Installation of Pump No. 5 at Carraizo Dam
back to top