PAINT PROJECTS

PAINT PROJECTS
PAINT AREA SETUP MEN AT WORK MIXING CREW COATING INTERNAL AST TANK
FINISH PRIMER COATING APPLYING SECOND COAT 12 MILS IN THE PROCESS OF PAINTING COATING SECOND COAT OF EPOXY 8 MILS PER COAT
FINAL COAT TO INTERNAL OF TANK FLOOR VACUUM DUSTLESS BLASTER BLASING AND COATING BLASTING AND COATING
INSPECTING CLEANSINESS BEFORE APPLYING SECOND COAT VACUUM BLASTING AND CLEANING TO GET READY TO PAINT VACUUM BLASTING WITH RECYCLABLE SHOT  AND GRIT COMBINED FAN MIXER AREA COATED
SUMP AREA COATED INLET DIFFUSER AREA COATED FINAL RESULA OF TANK COATING VERY OLD FORMER NAVY BUNKER TANK RESTORATION PROJECT
FINAL PICTURE MOVIE OF COATING WORKS INSIDE DEMINERALIZED WATERT TANK MOVIE OF EXTERNAL RIVETED VERY OLD FLOATING ROOF TANK COATING RIVETED TANK IN PROGRESS USING THE FLOATING ROOF AS SCAFFOLD
FINISH COAT APPLICATION OVER THE HOLDING PRIMER PRIMED SURFACE OF VERY OLD PITTED INTERNAL SHELL STRIKE COATING THE BLASTED AREA BEFOR APPLYING THE FULL PRIMER SAND BLASING IN PROGRESS
AREA SANDBLASTED READY TO APPLY PRIMER